28th January 2006
Click on an image below for a larger version:
|
|
|
|
|
|
The starboard side main landing gear door is attached to DG
|
The MLG door jack is fitted
|
The fitted MLG door jack
|
The MLG doors
|
James fitting netting inside the port MLG bay to prevent birds nesting in there
|
|
|
|
|
|
|
Kris fitting netting inside the port MLG bay to prevent birds nesting in there
|
Fitting a new hinge to the starboard MLG door
|
The two MLG doors are locked closed
|
Paul, Mags and Christiaan fitting piano joint cover plates
|
Fitting piano joint cover plates
|
|
|
|
|
|
|
UniS volunteers begin work sanding the underside of the engine intakes
|
Me knocking out shims on the top of the engine centre walls to make the fitting of the walls easier
|
Fitting the port side engine centre walls
|
Fitting the port side engine centre walls
|
UniS volunteers have now given the engine bay doors their first coat of white top coat
|
Photographs Copyright © Neil Walker and James Cullingham 2006