Fitting DG's Engine Intakes (24th January 2006)
Click on an image below for a larger version:
|
|
|
|
|
|
Volunteers from BA engineering guide the left side engine intake onto the forks of the forklift
|
The forklift begins to lift the left side intake
|
The forklift positions the left intake underneath the wing
|
The forklift positions the left intake underneath the wing
|
The forklift positions the left intake underneath the wing
|
|
|
|
|
|
|
The engineers guide the intake onto the fixing points on the underside of the wing
|
The securing bolts are knocked into position
|
The securing bolts are knocked into position
|
The securing bolts are knocked into position
|
With the intake held in place, the forklift moves away
|
|
|
|
|
|
|
One of the intake fixing points
|
The fitted left intake
|
The fitted left intake
|
The fitted left intake
|
The forklift lifts the right side intake into position
|
|
|
|
|
|
|
The right intake is guided onto the fixing points
|
The right intake is guided onto the fixing points
|
The securing bolts are knocked into position
|
The right intake fixed in position
|
The forward section of the right side centre wall is lifted into position
|
|
|
|
|
|
|
The forward section of the right side centre wall is fixed into position
|
The fitted forward section of the centre wall
|
The heavier aft section of the right side centre wall is lifted into position by the forklift
|
The aft section of the right side centre wall is lifted into position by the forklift
|
The aft section of the right side centre wall is fixed into position
|
|
|
|
|
|
|
A view of the fitted engine intakes
|
The cockpit restoration team have now fitted many of the instruments to the engineers panel
|
Newly fitted instruments on the engineers panel
|
Newly fitted instruments on the engineers panel
|
Delta Golf resplendent with engine intakes once again!
|