Maintenance Day (19th April 2007)
Click on an image below for a larger version:
|
|
|
|
|
|
The floor in the rear cabin is removed to allow routing of air conditioning ducts and wiring
|
The mass of wires and pipes running under DG's cabin floor
|
Routing AC power cable
|
AC ducting running through a newly cut hole in the cabin floor
|
AC ducting running through a newly cut hole in the cabin floor
|
|
|
|
|
|
|
AC ducting and power cables running through a newly cut hole in the cabin floor
|
The air con ducting as seen from below the cabin floor (this is the inside of DG's original AC bay)
|
Power cables
|
More work to route AC power cables
|
Cutting a hole for AC ducting
|
|
|
|
|
|
|
A hole for AC ducting to be fed through
|
The new panel fitted to prevent people from reaching behind the perspex panels in the '70s' area
|
The carpet is re-layed
|
Re-fitting the perspex panels
|
The perspex panels and new 'anti-hands' panel
|
Photographs Copyright © Neil Walker 2007