18th June 2005
Click on an image below for a larger version:
|
|
|
|
|
|
DG's droop nose - recently moved alongside the fuselage inside the tent
|
James and Roger busy sanding body panels
|
Another view of the droop nose
|
The nose visor
|
The rear fuselage section
|
|
|
|
|
|
|
Sanded body panels waiting alochroming and Priming
|
Priming of the starboard side of the centre fuselage nearly complete
|
An ASI engineer working on the right wing
|
James sanding a body panel
|
Gordon sanding a body panel
|
|
|
|
|
|
|
Roger sanding a body panel
|
Priming of the right side of the centre fuselage is now complete
|
Priming of the right side of the centre fuselage is now complete
|
Priming of the right side of the centre fuselage is now complete
|
Kris alochroming a body panel
|
|
|
|
|
|
|
The left wing sitting on the special jig ready to be moved against the fuselage and re-joined
|
The left wing sitting on the special jig ready to be moved against the fuselage and re-joined
|
James, Gordon and Roger sanding body panels
|
A view of the forward end of the right wing. This shows one of the wing re-join repairs
|
This shot of the inside of the wing is the other side of the repair shown in the previous photo
|
|
|
|
|
|
|
The forward wing sections from each wing
|
The outer wing sections from each wing
|
ASI are nearly complete with the preparation work on the left wing ready for it to be re-joined
|
Some of the aluminium channel bars waiting to be attached to the left wing
|
Sections of the larger aluminium channel that will be used to re-join the left wing
|
Photographs Copyright © Neil Walker 2005