Header Image


Concorde  15th October 2005




Click on an image below for a larger version:



The cherry picker moves into position at the top of the left MLG

Gordon fixes the crane grapple fixture to the top of the left MLG

Gordon fixes the crane grapple fixture to the top of the left MLG

The wheels being removed from the MLG bogie

The crane moves the MLG towards the gear trolley


The crane moves the MLG towards the gear trolley

A view of DG from the cherry picker

The crane moves the MLG towards the gear trolley

The MLG is lowered onto the trolley

The top of the MLG


DG sitting high in the air while the landing gear is fitted

DG sitting high in the air while the landing gear is fitted

The right side MLG in the process of being re-fitted to DG

The right side MLG

One of the two 'spiders' supporting the rear half of DG


Lots of head scratching to decide how to fit the secondary nose gear doors

The first of the secondary nose gear doors is fitted

The first of the secondary nose gear doors is fitted

Delta Golf's nose gear

Dad and Dave working inside the nose gear bay


The starboard main nose gear door goes back on

The other secondary nose gear door is fitted

The main and secondary nose gear doors (port side)

Dad removing the cover plate from the water drain mast fixing point

Fitting the water drain mast


The fitted water drain mast

The sanded MLG bay doors

UniS students painting the MLG bay doors

Barry painting the MLG bay doors

Roger painting the tail cone


Photographs Copyright © Neil Walker 2005



Top of Page