15th October 2005
Click on an image below for a larger version:
|
|
|
|
|
|
The cherry picker moves into position at the top of the left MLG
|
Gordon fixes the crane grapple fixture to the top of the left MLG
|
Gordon fixes the crane grapple fixture to the top of the left MLG
|
The wheels being removed from the MLG bogie
|
The crane moves the MLG towards the gear trolley
|
|
|
|
|
|
|
The crane moves the MLG towards the gear trolley
|
A view of DG from the cherry picker
|
The crane moves the MLG towards the gear trolley
|
The MLG is lowered onto the trolley
|
The top of the MLG
|
|
|
|
|
|
|
DG sitting high in the air while the landing gear is fitted
|
DG sitting high in the air while the landing gear is fitted
|
The right side MLG in the process of being re-fitted to DG
|
The right side MLG
|
One of the two 'spiders' supporting the rear half of DG
|
|
|
|
|
|
|
Lots of head scratching to decide how to fit the secondary nose gear doors
|
The first of the secondary nose gear doors is fitted
|
The first of the secondary nose gear doors is fitted
|
Delta Golf's nose gear
|
Dad and Dave working inside the nose gear bay
|
|
|
|
|
|
|
The starboard main nose gear door goes back on
|
The other secondary nose gear door is fitted
|
The main and secondary nose gear doors (port side)
|
Dad removing the cover plate from the water drain mast fixing point
|
Fitting the water drain mast
|
|
|
|
|
|
|
The fitted water drain mast
|
The sanded MLG bay doors
|
UniS students painting the MLG bay doors
|
Barry painting the MLG bay doors
|
Roger painting the tail cone
|
Photographs Copyright © Neil Walker 2005