Header Image


Concorde  Fitting DG's Elevons (8th November 2006)




Click on an image below for a larger version:



Volunteers from BA engineering fitting the no.2 elevon

The no.1 elevon is positioned in place

The hinge pin is knocked into place

The completed left side

The no.4 elevon is prepped for fitting


The no.4 RH elevon fitted

The no's 3 and 4 RH elevons are fitted and locked in position

The no's 1, 2, 3 & 4 elevons on the left side

The no's 3 & 4 elevons on the right side

The final two elevons fitted in place on the right side


The no's 1 & 2 elevons fitted in place on the right side

The elevons on the right side are locked at 0 degrees using shims

The right side elevons

The completed right side

DG's right wing - really looking the part!


Photographs Copyright © Gordon Roxburgh 2006



Top of Page