Assembling DG's Tent (8th-9th March 2005)
Click on an image below for a larger version:
|
|
|
|
|
|
The framework for the tent sits ready to be erected
|
The first section of framework is lifted into position
|
The second section of framework is lifted into position
|
The second section of framework is lifted into position
|
The simulator is lifted and moved to its new location inside the tent
|
|
|
|
|
|
|
The last few sections of framework being lifted into position
|
The last section of framework is fixed into position
|
The completed tent structure - now just waiting for the cover to go on
|
The completed tent structure - now just waiting for the cover to go on
|
The completed tent structure - now just waiting for the cover to go on
|
|
|
|
|
|
|
The first panel of the roof is pulled over the top of the framework
|
ASI re-position the forward fuselage
|
The roof is completed
|
The side panels all fitted
|
The tent nearly complete - just the end panels and the doors to go
|