Air-bagging & Jacking DG (6th-8th October 2005)
Click on an image below for a larger version:
|
|
|
|
|
|
Air bags under the starboard wing lift Delta Golf to enable fitting of the landing gear
|
Air bags under the fuselage
|
As the air bags inflate the jacks are raised to take the weight of the cradle
|
The air bag control trailer
|
The smaller jacks are disconnected
|
|
|
|
|
|
|
The smaller jacks are removed
|
The jacks supports under the wing ready for the large Concorde jacks to be attached
|
The first of the large jacks is maneuvered under the starboard wing
|
The next jack is maneuvered under the port wing
|
The two rear jacks waiting to be aligned with supports under the wing
|
|
|
|
|
|
|
The rear of DG supported by air bags
|
The port wing of DG supported by air bags
|
The rear jacks in postion and attached to DG
|
One of the large forward jacks waiting to be positioned
|
The first of the forward jacks is positioned under the cradle that supports the forward fuselage
|
|
|
|
|
|
|
All four large jacks now supporting DG
|
The forward half of DG now sitting at about three quarters full height
|
The forward half of DG now sitting at about three quarters full height
|
Delta Golf's port wing nearly at full height
|
The rear half of DG sitting on the jacks at near full height
|
|
|
|
|
|
|
The rear half of DG sitting on the jacks
|
The rear half of DG sitting on the jacks
|
The nose gear hangs on the winch waiting to be fitted
|
The forward fuselage jacked up to near full height
|
The proper Concorde nose gear fitted to Delta Golf for the first time since the 1980's
|