Concorde  Re-positioning DG's airframe (3rd March 2005)




Click on an image below for a larger version:



The rear fuselage is lifted onto a flatbed lorry

The rear fuselage sitting on the back of the lorry

The centre fuselage section is lifted and moved centrally between the 2 inner wing sections

The centre fuselage section is lifted and moved centrally between the 2 inner wing sections

The forward fuselage being lifted by crane


The forward fuselage being lowered onto a jig ready to be moved into position for re-attachment to the centre fuselage

A big crane!!

The rear fuselage being lowered in position onto a pile sleepers behind the centre fuselage

The centre fuselage section is lifted and moved centrally between the 2 inner wing sections

The centre fuselage section is lifted and moved centrally between the 2 inner wing sections


The right wing is lifted off the ground and then lowered onto a custom made jig

The crane begins to lift the left wing

The left wing is temporarily lowered onto a pile of wooden crates awaiting the special jig that is currently supporting the right wing

The forward fuselage being moved on its jig to be positioned in front of the centre fuselage ready to be re-attached

All 5 of the main sections now in position and ready for re-assembly work to begin


Photographs Copyright © Gordon Roxburgh 2005