Re-positioning DG's airframe (3rd March 2005)
Click on an image below for a larger version:
|
|
|
|
|
|
The rear fuselage is lifted onto a flatbed lorry
|
The rear fuselage sitting on the back of the lorry
|
The centre fuselage section is lifted and moved centrally between the 2 inner wing sections
|
The centre fuselage section is lifted and moved centrally between the 2 inner wing sections
|
The forward fuselage being lifted by crane
|
|
|
|
|
|
|
The forward fuselage being lowered onto a jig ready to be moved into position for re-attachment to the centre fuselage
|
A big crane!!
|
The rear fuselage being lowered in position onto a pile sleepers behind the centre fuselage
|
The centre fuselage section is lifted and moved centrally between the 2 inner wing sections
|
The centre fuselage section is lifted and moved centrally between the 2 inner wing sections
|
|
|
|
|
|
|
The right wing is lifted off the ground and then lowered onto a custom made jig
|
The crane begins to lift the left wing
|
The left wing is temporarily lowered onto a pile of wooden crates awaiting the special jig that is currently supporting the right wing
|
The forward fuselage being moved on its jig to be positioned in front of the centre fuselage ready to be re-attached
|
All 5 of the main sections now in position and ready for re-assembly work to begin
|