Header Image


Concorde  Fitting the port side TSN (3rd February 2006)




Click on an image below for a larger version:



Preparing the TSN fixing points on the aft centre wall

The forklift lifts the TSN

The forklift moves the TSN into position

The TSN is bolted in position

The TSN is bolted in position


The forklift prepares to move away

The fitted port side Twin Secondary Nozzles

The fitted TSN

The fitted TSN

The fitted TSN


Photographs Copyright © Gordon Roxburgh 2006



Top of Page